During the implementation of utility-scale solar power plants and commercial & industrial (C&I) photovoltaic projects, the structural reliability and on-site assembly efficiency of the mounting system directly determine lifecycle return on investment and overall system safety. The U2V solar ground mounting system launched by CHIKO SOLAR demonstrates outstanding adaptability across varied terrains and geological conditions, drawing on a well-defined load-bearing configuration and a modular assembly scheme.
在大型地面电站与工商业光伏项目的实施过程中,支架系统的结构可靠性与现场装配效率,直接关系到整个生命周期的投资回报与系统安全。晨科太阳能(CHIKO SOLAR)推出的U2V太阳能地面支架系统,凭借明确的结构受力逻辑与模块化装配方案,在各类地形与地质条件下展现出优异的适用性。

At the core of the system is a proven dual-post triangular bracing structure featuring U-shaped posts and V-shaped diagonal braces. This closed-geometry layout evenly distributes and transfers module self-weight, beam dead load, wind loads, and snow loads directly to the foundation piles. It substantially enhances lateral drift stiffness in both east-west and north-south directions, providing long-term, rigid support for solar modules even under severe weather conditions such as high winds and heavy snowpack.
该系统核心采用经典成熟的“U型柱+V型斜撑”双立柱三角支撑架构。这一闭合受力几何形态能够将光伏组件与横梁自重、风载及雪载均匀分散并传递至基础桩位,显著强化了东西向与南北向的抗侧移刚度,在暴风、重雪等恶劣气候环境下依然能为光伏组件提供长期稳定的刚性依托。

To withstand harsh outdoor exposure involving continuous sunlight, rain, high humidity, and salt spray corrosion, the primary structural components of the U2V system are fabricated from rigorously surface-treated high-strength hot-dip galvanized steel or premium-grade aluminum alloy profiles. Critical load-bearing joints and fasteners are safeguarded with strict anti-corrosion coatings. This material durability meets demanding long-term outdoor service requirements, effectively resisting electrochemical corrosion while significantly lowering inspection and maintenance burdens over the project lifecycle.
针对户外长期日晒雨淋及高湿、盐雾等复杂侵蚀环境,U2V系统主体构件选用经过严密表面处理的高强度热镀锌钢或优质铝合金型材,紧固件及受力节点均辅以严苛的防腐涂层,材料耐候性充分满足户外长期服役要求,在有效抵御电化学腐蚀的同时,大幅降低电站全生命周期内的巡检与维护负担。

To address high construction labor costs in ground-mounted projects, CHIKO applies a high degree of pre-assembly to key mounting nodes prior to factory dispatch. On-site installation requires no tedious cutting or welding; crews quickly complete beam-to-column connections and module fastening using standard hardware and sliding-channel fittings. This design not only shortens installation schedules, but also minimizes human installation tolerances, ensuring a clean, uniform array layout.
为应对地面工程中高昂的施工成本,晨科在出厂阶段即对U2V支架的关键节点进行了高度预装配设计。现场安装无需繁琐的切割或焊接作业,施工人员通过标准紧固件与滑槽配件即可快速完成梁柱拼接与组件固定,不仅显著缩短了施工周期,还大幅减少了人为安装公差,确保阵列排布工整规整。

Furthermore, the U2V mounting system delivers excellent engineering versatility, seamlessly adapting to ground screws, driven concrete piles, or precast concrete ballast blocks based on geotechnical site reports. Whether deployed across wide-open deserts and plains or on undulating hills and slopes, the system accommodates varying terrain inclines through adjustable segment fittings, achieving secure, reliable anchoring and delivering solid support that balances structural integrity with project cost-efficiency for ground-mounted solar assets.
此外,U2V支架展现出卓越的工程兼容性,可根据项目地勘报告灵活适配螺旋地桩、水泥灌注桩或混凝土预制块基础。无论是平坦开阔的荒漠与平原,还是起伏不平的缓丘山地,系统均可通过调节节段适应地形坡度,实现安全牢固的工程锚固,为地面光伏资产提供兼具结构安全性与建设经济性的坚实支撑。


Above news from CHIKO Sales & Marketing department
Add: No 680 Xingwen Rd. Jiading dist. Shanghai 201801 China
Email: Chiko@Chikolar.com
Website: http://www.chikolar.com
Fax : +86 (21)59972938
Phone: +86(21) 59972267 59973712 59973713--811