Solar bracket mounting Operating Instructions  

Data:2017-07-19

The preparation of Solar bracket mounting
First, we should erection of unloading platform and personnel walkway In each factory plant corresponding location, And laying bulk passageway in the rooftop to avoid damage to the roof. Then clean the roof drainage system to avoid the rainy season Poor water flow.
Second, Verification of roof conditions Before construction, if the encounter and design does not meet, The construction program should be adjusted according to the design. Measure Actinomyces according to the baseline position identified in the design drawing and control the right-angled direction of each square. Take the rooftop sun rays center for horizontal baseline. To determine the location of the entire square according to the design drawings.
Third, Calculate the design drawings, calculate the area of the bracket rails, accessories and components of the use, to process in batches according to the number of areas and the construction
Forth, After the solar brackets is ready, Check for damage to the package. If there is damage ,should timely communication with the procurement staff to replacement
Fifth, The solar stent is shipped to the roof according to the area, should arrangement for staff scattered in place timely. 

Solar bracket mounting Operating:
According to the design drawings to positioning the line, Color steel roof is mainly fixture positioning, followed by solar rails installation, pay attention to the fixture spacing, with the row of components and adjacent rails and two rows of rails. The mounting of the rails should be mounted in the order of the rail links at both ends of the intermediate section. After the installation of the rails is completed, the level of each guide rail should be checked and the bending degree of each rail shall not be greater than 1mm. After completing a set of brackets, perform accurate verification of the bracket position. Pay attention to the distance between the front and rear, the design requirements from the wall distance. Lifting and handling process to take protective measures to avoid personal injury and damage to the original building. In addition, the installation of bracket columns, beams and rails do not once the bolts in place, all the straightening of the bracket after the bolt all the fastening.
 
solar rail grounding system
Components, rails and fixtures should be connected between the reliable. Each component of the array of rails must be grounded with flat steel, bolts fastened, and connected with the factory grounding system.

Safety Precautions
First,Hoisting personnel must have the safety work certificate issued by the Safety Supervision Bureau of the government
Second,Lifting equipment must be within the period of validity and subject to trial equipment.
Third,When lifting operations, the scene must be monitored and directed
Froth,It is forbidden to stay and stack valuables in the lifting range
5, the lifting operation must check whether the rope hanging, in a safe range.
6,Hoisting work must be provided with warning lines to alert pedestrians and vehicles around
7.When handling the support, pay attention to the construction line at the gangway to prevent tripping
8, people are strictly prohibited from loading and unloading the stairs, and No matter is the ladder or inclined ladder should hands grip handrails。
9、Scaffolding erection must be in accordance with the scaffolding construction program, qualified before use
10、Collect waste piled up, do the work, the material, the site is clean.
11、The transport components on the roof must have a safe channel for board laying, and the use of pallets instead of the roof is liable to cause damage to the roof
12、The components must be lifted by crane and not allowed to be manually transported to the roof
13、The roof rubbish should be cleaned in time, and the sewer can not be blocked. Smoking is forbidden in the factory area
14、Pay attention to cross site construction operations, equipment installed in the kit, as far as possible, to prevent falling injured people or components
15、The packages and trays are stacked at designated locations and should not be discarded at will
16、People with poor physical condition are strictly prohibited from climbing. No smoking is allowed on site
17、Construction personnel enter the guard must register, wearing a helmet, chest card can enter the construction site, walking must leave all line, without permission not to rush to the production plant and other areas
18、Do the thunderstorm season protective measures, and prepare the necessary sunstroke medicines for construction personnel. Adjust the schedule, avoid high temperature at noon time, and asked the staff responsible for the logistical work.

Emergency treatment.
Construction personnel injured at the scene, such as skin trauma,should  on-site ambulance dressing; such as greater harm, the injured should be moved to rest places, notify the scene of the person to deal with, emergency treatment to the hospital
 


Above new from CHIKO Sales & Marketing department
Add: No 680 Xingwen Rd. Jiading dist. Shanghai 201801 China
Phone: +86(21) 59972267 59973712 59973713--811
Fax : +86 (21)59972938
Email: Chiko Solar@Chiko Solarlar.com
Website: http://www.Chiko Solarlar.com
WhatsApp:0086 13816459677